|} The Chengdu–Chongqing Intercity Railway () is a long high-speed railway that will connect the cities of Chengdu (Sichuan) and Chongqing in southwestern China, with a planned maximum speed of 350 km/h. The route will pass through most of the same cities that the older Chengdu–Chongqing Railway does, but will be significantly shorter due to the greater use of elevated sections and tunnels. It is expected to reduce travel time between Chengdu and Chongqing to 75 minutes, 45 minutes quicker than the current CRH route via Suining. The line will include four major elevated sections and two tunnels.〔(成渝客运专线最快2014年通车 ), luzhouol.cn, 2012-07-31〕 Construction on the Chongqing section began on 22 March 2010 while work on the Sichuan section began on 11 November. The final tunnel achieved breakthrough on 16 December 2013 and a single track line was expected to open in first half of 2014. The complete double track configuration was due to be completed by the end of 2014.〔(Chengyu Passenger Line achieves breakthrough )〕 ==Railway stations== There will be 12 stations along the line: Sichuan section *Chengdu East Railway Station *Jianyang South Railway Station *Ziyang North Railway Station *Zizhong North Railway Station *Neijiang North Railway Station *Longchang North Railway Station Chongqing section *Rongchang North Railway Station *Dazu Railway Station *Yongchuan East Railway Station *Bishan Railway Station *Shapingba Railway Station *Chongqing Railway Station 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Chengdu–Chongqing Intercity Railway」の詳細全文を読む スポンサード リンク
|